适用范围:

5.1 This is not a routine test. The values recorded are applicable only to the sewer being tested and at the time of testing.1.1 This test method covers procedures for testing concrete pipe sewerlines, when using the negative air pressure (vacuum) test method to demonstrate the integrity of the installed material and the construction procedures. This test method covers testing of 100 to 900-mm diameter circular concrete pipe sewerlines utilizing gasketed joints.NOTE 1: The user of this specification is advised that methods described in this test method may also be used as a preliminary test to enable the manufacturer or installer to demonstrate the condition of sewer pipe prior to delivery or backfill. Minimum test times presented in Table 1 are for pipelines. Holding times for testing an individual pipe may have to be increased to allow for the accumulation of leakage when the tested pipe are incorporated into a continuous pipeline.NOTE 2: The user of this test method is advised that the negative air pressure (vacuum) test criteria presented in this test method are similar to those in general use. The test and criteria have been used widely and successfully in testing smaller diameter pipe. Larger pipe will be accepted more conveniently by visual inspection and individual joint testing.NOTE 3: Test times tabulated and the rate of air loss in this standard are based on successful testing of installed pipelines. However, since air and water have different physical properties, retests of some pipelines not meeting field air tests have been successful when tested with water.1.2 This test method is the SI companion to Test Method C1214.1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use. See Section 6 for specific safety precautions.1.4 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.

基本信息

  • 标准号:

    ASTM C1214M-19

  • 标准名称:

    Standard Test Method for Concrete Pipe Sewerlines by Negative Air Pressure (Vacuum) Test Method (Metric)

  • 英文名称:

    Standard Test Method for Concrete Pipe Sewerlines by Negative Air Pressure (Vacuum) Test Method (Metric)
  • 标准状态:

    Active
  • 发布日期:

  • 实施日期:

  • 出版语种:

标准分类号

  • 标准ICS号:

    23.040.50
  • 中标分类号:

关联标准

  • 替代以下标准:

  • 被以下标准替代:

  • 引用标准:

  • 采用标准:

出版信息

  • 页数:

    4 页
  • 字数:

  • 开本:

其他信息

  • 起草人:

  • 起草单位:

  • 归口单位:

    C13.09
  • 提出部门:

  • 发布部门:

  • 推荐标准
Baidu
map